Research Facility

Since the Milford Rd workshop was vacated, which was no longer needed for the next phase, a new facility for development has been designed and build.
This is a low-cost semi-permanent 300 sq. foot facility.

This is perfectly adequate for development of the components of the Mass-EV as a vehicle test-bed in the Milford Rd workshop was created previously.
This is stored off-road with good road access and plenty of space both inside and out for adapting and testing.

Inside


The internal floor space to the walls is 6m x 4.8m with 2m standing height.
Including the bench and shelf space the total surface space is over 50m2 or nearly 550 ft2

The original workshop at Milford rd was around 150m2 to which was added about 10m2 of bench space.